What is Power Apps
Power Apps is Microsoft's low-code platform for building business applications. It lets you quickly deliver a tailored app — a form, a register, an approval process or a mobile app for field staff — and roll it out in the browser, in Teams and on phones.
Power Apps offers two main app types:
- Canvas apps — freely designed screens, ideal for mobile and field scenarios, simple forms and apps where user experience matters most.
- Model-driven apps — apps built on a data model in Dataverse, with generated forms, views, relationships and business process flows. They suit larger processes with many entities and roles.
The family also includes Power Pages for external portals (customers, suppliers, applicants) and AI Builder for document processing, image recognition and predictions inside your apps.
Low-code speeds up delivery but does not remove the need for design. What makes the difference is a sound data model, role-based permissions, separate environments and proper application lifecycle management (ALM). That is what allows an app to grow from one team to the entire organisation.
Who it is for
Power Apps development makes sense when:
- a process runs today on spreadsheets, e-mail or paper and needs to be digitised,
- you need an app quickly and cost-effectively, typically for internal users,
- you run Microsoft 365 and want to leverage licences and identity you already manage,
- technicians, sales reps or inspectors need a mobile app that works without a signal,
- your standard systems (ERP, CRM) do not cover a specific process and customising them would be expensive.
For apps with thousands of external users, extreme performance requirements or a highly specific user interface, we usually recommend custom software development — or a combination where Power Apps serves as the internal back office.
A typical project and timeline
- Process assessment (1 week). We review the current process, user roles, data and dependencies on other systems, and produce an app outline with an estimate of the benefit.
- Data design and prototype (1–2 weeks). Data model, key screens and a clickable prototype so users can confirm the app does what they need.
- Build (typically 3–6 weeks). The app, permissions, follow-up steps automated with Power Automate and integration with other systems.
- Testing and roll-out (1–2 weeks). User acceptance testing, migration of data from legacy spreadsheets, training and go-live.
- Operations and evolution. Improvements based on feedback, additional modules and usage monitoring.
Simpler apps are typically live within a month; larger multi-module solutions are delivered step by step in successive phases.
Integration with Microsoft products
- Microsoft Teams — apps as tabs, notifications and approvals in chat.
- SharePoint and OneDrive — documents and attachments linked to records, templates and document generation.
- Dataverse and Dynamics 365 — data shared with CRM and ERP, record-level security.
- Power BI — embedded reports inside the app and analytics on app data with Power BI.
- Azure — custom APIs, Azure Functions and AI services for advanced scenarios.
Power Apps connects to non-Microsoft systems through standard connectors (SQL, SAP, Salesforce) or a custom connector to any REST API.
How we work together
- Turnkey app — from analysis to go-live with an agreed, fixed scope.
- Incremental delivery — a first version in production fast, further features prioritised in regular iterations.
- Support for in-house makers — app reviews, architecture, templates and best practices for your citizen developers.
- Taking over existing apps — stabilising, speeding up and tidying up apps that grew without governance.
Use cases
Common pitfalls we help you avoid
Power Apps makes it possible to build an app very quickly — and just as quickly to end up with a tangle of unmanaged apps. These are the issues we encounter most often:
- SharePoint lists where Dataverse belongs. Fine for simple registers, but with growing volumes, relationships or sensitive data they fall short on both performance and security.
- Building directly in production. Without a separate development environment, every change puts users at risk.
- Personal accounts in connectors. When the author leaves, the app stops working. We use service accounts and managed sharing.
- No documentation. A short description of data, permissions and automations saves time on every future change.
- Licensing as an afterthought. The licence type shapes the architecture, so we address it during design.
Benefits
Frequently asked questions
What is the difference between canvas and model-driven apps?
Canvas apps give full freedom over screen design; model-driven apps are generated from the Dataverse data model and suit larger business processes.
When is custom development better than Power Apps?
For public-facing apps, extreme performance needs or highly specific UI. We help you choose the right approach.
Can the app work offline?
Yes, Power Apps supports offline mode for mobile scenarios.
Interested in Power Apps development?
Tell us briefly what you are working on. We usually reply within one business day to arrange a free consultation.
Fields marked * are required.
Related services
Microsoft Dataverse — data platform and integration
A secure, scalable store for the data behind your Power Platform and Dynamics 365 apps.
Process automation with Power Automate
We automate repetitive work — approvals, data transfers and even work in legacy applications.